You are here

Apr
10
2017

This winter, OTN completed the first portion of this multi-phase project, successfully prepping and coating the second floor corridors and interior bowl seating area walkways at the Baltimore Arena.

The Arena continues to operate on its full event schedule resulting in a challenging time-line and round-the-clock work hours for completing each phase of the project. Approximately 35,000 square feet of flooring surface has been prepped and coated to date.

Read More...
Blasting & Painting

Crescent Luxury Apartments

Feb
21
2012

The Crescent Luxury Apartments in Arlington, Virginia feature environmentally sensitive living coupled with lavish amenities. Sleek architectural design is a major component of the interior, exterior and social spaces of the complex. An integral feature of the design is the stylish and minimal steel railings on balconies, defining outdoor social spaces and joining the gates and canopies over building entrances. Accenting the minimal design of the railings, gates and canopies is their striking aluminum metallic finish.

Read More...
Aug
09
2016

Facility Exterior Stairs Receive Much Needed Repairs

Faced with safety issues caused by the spalling and cracking of the heavily used exterior concrete stairs, OTN delivered much needed repairs.

The failing areas were patched and restored to even surface areas and coated with a cementitous urethane providing resistance to abrasion and harsh weather conditions.

Read More...
Feb
16
2011

Searching for an Experienced Industrial Painting Contractor

The task was to find an industrial painting contractor within the Maryland Virginia region with the experience and knowledge to prep and paint the failing surfaces of thirty-three toll plazas on Dulles International Airport’s Toll Road without disruption to the heavy traffic volume accessing one of the world’s busiest airports. The Industrial Coatings Contractor chosen to travel to Virginia to stage and complete this complex project was O.T. Neighoff & Sons, Inc.

Read More...
Commercial Painting & Finishes

Featured Project: Meadowbrook Aquatic Center

Jan
24
2013

A Baltimore institution since 1930, Meadowbrook has evolved from an outdoor swimming and social club to a state of the art Aquatic Center and Exercise Facility. Meadowbrook Aquatic Center still features the large outdoor pool for which it is so well known, as well as the large indoor Pool House constructed in 1994 and the adjoining exercise facility with panoramic glass windows that overlook both the indoor and outdoor pools. The Indoor Pool Building holds a 50-meter, six lane Main Pool, a Therapy Pool and the Indoor Hot Tub.

Read More...
Oct
26
2011

Project Scope and Timeline

The few short precious months of summer are indeed a valuable time at the United States Naval Academy. It is during these months that maintenance work is performed so that the remainder of the year the Academy may remain focused on the education and training of some of our country’s most elite men and women.

Read More...

Pages